North Sea Observatory, Skegness
Main Contractor – Gelder Group
Value – £200,000
Hot Rolled Steel – 83 T
Cold Rolled Purlins/Rails – 10 T
Pre-cast concrete planks 45 t, a very challenging project, on the beach directly opposite an offshore windfarm we utilised a 5 axle mobile tower crane because the reach for a mobile crane was excessive and the crane position was below the site so the crane driver was able to look down on the site rather than work blind and using two way radios.