Skelton Retail Development, Guisborough
Main Contractor – Tolent Construction
Value – £210,000
Hot Rolled Steel – 110 T
Cold Rolled Purlins/Rails – 20 T
Supplied on a design and build basis.
Main Contractor – Tolent Construction
Value – £210,000
Hot Rolled Steel – 110 T
Cold Rolled Purlins/Rails – 20 T
Supplied on a design and build basis.
Main Contractor – RG Carters
Value – £410,000
Hot Rolled Steel – 218t
Cold rolled purlins/rails – 35t, this storage facility is a propped portal height at the ridge was 20 mtrs
Main Contractor – Gelder Group
Value – £200,000
Hot Rolled Steel – 83 T
Cold Rolled Purlins/Rails – 10 T
Pre-cast concrete planks 45 t, a very challenging project, on the beach directly opposite an offshore windfarm we utilised a 5 axle mobile tower crane because the reach for a mobile crane was excessive and the crane position was below the site so the crane driver was able to look down on the site rather than work blind and using two way radios.
Main Contractor – Clegg Construction
Value – £600,000
Hot Rolled Steel – 250 T
Pre Cast Concrete Planks 1000 Lifts/ 280t
The next phase of this challenging project again required precise planning and organisation, the structure was regarded as a new build but eventually connected to the existing building, the major problem with this phase was the first elevation was the boundary of the main Sheffield to Rotherham rail link but a close partnership between ourselves and network rail eradicated any issues with the crane-age and the erection of the frame, included in this phase was a 15 t piece small truss and ramps linking each level to the levels below.
We also erected 6 sets of stair housings around the existing building on Phase 1 and around the new build Phase 2.
<h1>Recent Projects</h1>
Main Contractor – Tolent Construction
Value – £400,000
Hot Rolled Steel – 220 T
Cold rolled purlins/rails-25 t this included erecting a free standing mezzanine floor within the building once the new structural slab had been poured, no cranes to erect all carried out using a telescopic telehandler.
Main Contractor – Bardsley Construction
Value – £140,000
Hot Rolled Steel – 90 T
Cold Rolled Purlins/Rails – 1 T
Cold Rolled Decking – 20 Packs
Pre cast concrete stairs – 8 flights, the site was tight all steel had to be delivered on flat bed rigid trailers, 16mtr columns had to be spliced due to access constraints.
Main Contractor – Dam Structures
Value – £20,000
Hot Rolled Steel – 50 T
All steel supplied free issue for ourselves to cut/drill/fabricate/weld, frames weighed 4 t a piece; we could only load 4 per wagon due to the width/weight and general awkwardness/shape of the fabricated pieces.
Main Contractor – Lindum Construction
Value – £210,000
Hot Rolled Steel – 147 T
Cold Rolled Decking – 20 Packs
Pre Cast Concrete Stairs 6 Flights
This included after the frames completion the site drilling and cutting through 250mm of roof build up so that the commentators/stewards housing box could be landed, on the already erected steel members, by others and fixed down.
<h1>Recent Projects</h1>
Main Contractor – John Sisk And Sons
Value – £1,500,000
Hot Rolled Steel – 1000t
Cold Rolled Purlins/Rails – 60t
Cold Rolled Decking – 20 Packs
Pre-cast concrete stairs 8 flights/lift shaft 8 sections including an 80 t transfer truss made out of 4 sections erected in one day.
Main Contractor- RG Carters
Value – £560,000
Hot Rolled Steel – 430t
Cold Rolled Purlins/Rails – 20t
Cold Rolled Decking – 30 Packs
Pre-cast concrete stairs 8 flights/lift shaft 5 sections including all auditorium seating steel work.