Synter BMW Sheffield Phase 1

Synter BMW Sheffield Phase 1

Main Contractor – Clegg Construction

Value – £900,000

Hot Rolled Steel – 750 T

This challenging project required precise planning and organisation, the steel was to be erected within an existing structure, 2 new floors were erected, connections to existing steels were carried out(all site drilled by our site teams).