Moat Hill
Main Contractor - Hobson and Porter Value - £430,000 Hot Rolled Steel - 207 T Design of connections only. Special information – 25% of the frame is reused steel. [...]
Parkinson Harness
Main Contractor - Clegg Construction Value - £365,000 Hot Rolled Steel - 150 T Pre Cast Concrete Planks - 1000 Lifts / 280 T Design and build of the steel frame. [...]
Synter BMW Sheffield Phase 2
Main Contractor - Clegg Construction Value - £600,000 Hot Rolled Steel - 250 T Pre Cast Concrete Planks - 1000 Lifts / 280 T The next phase of this challenging project again required precise [...]
Monarch Hangar Birmingham International Airport
Main Contractor - John Sisk & Sons Value - £1,500,000 Hot Rolled Steel - 1000 T Cold Rolled Purlins/Rails - 60 T Cold Rolled Decking - 20 Packs Pre-cast concrete stairs 8 flights/lift shaft [...]
Synter BMW Sheffield Phase 1
Main Contractor - Clegg ConstructionValue - £900,000Hot Rolled Steel - 750 TThis challenging project required precise planning and organisation, the steel was to be erected within an existing structure, 2 new floors were erected, connections [...]
Temporary Market, Warrington
Main Contractor - CPUKValue - £450,000Hot Rolled Steel - 321 TCold Rolled Purlins/Rails - 25 TCold Rolled Decking - 20 PacksThis project required precise planning and organisation, due to there being only one access onto [...]