Main Contractor – Tolent Construction
Value – £400,000
Hot Rolled Steel – 220 T
Cold Rolled Purlins/Rails – 25 T
This included erecting a free standing mezzanine floor within the building once the new structural slab had been poured, no cranes to erect all carried out using a telescopic telehandler.