Temporary Market, Warrington
Main Contractor-CPUK
Value – £450,000
Hot Rolled Steel – 321 T
Cold Rolled Purlins/Rails – 25t
Cold Rolled Decking – 20 Packs
This project required precise planning and organisation, due to there being only one access onto site, steel was supplied to site as required, the piece small trusses were built up on the floor and lifted into position using one crane, there was 8 trusses of which none were identical, the fabrication was of the highest quality.